Situation | Result | Impact |
Bath Western Riverside is a multi-phased development consisting of 813 units both commercial and residential. The goals were to provide at least 10% carbon savings from renewables or low-zero carbon energy technologies, and to meet BREEAM requirements. | AES were appointed to ensure that the dwelling adhered to the Code for Sustainable Homes and BREEAM requirements. Each phase consisted of different construction methods, innovative architectural design and was dictated by the applicable version of Building Regulations. | Early engagement ensured that the most cost-effective and viable solutions were used to meet the necessary requirements per phase. We ensured a consistent approach to the development's overall sustainability strategy. |
Bath Western Riverside, is a multi-phased development consisting of 813 units including residential dwellings and commercial spaces. Crest Nicholson Regeneration has re-developed a once industrial intensive site into an attractive riverside community.
The entire development’s space heating and hot water demands are served by central plants consisting of Mains Gas CHP, Biomass boilers and Gas back-up boilers.
Bath Western Riverside had site wide targets to provide at least 10% carbon savings from renewables and/or low-zero carbon energy technologies, as well as meeting all the requirements set by the Code for Sustainable Homes and BREEAM.
For the Bath Western Riverside development, we achieved the site wide targets through early engagement with the design team to ensure that the most cost-effective and viable solutions were used to meet the necessary requirements per phase.
Each phase consisted of different construction methods, innovative architectural design and were dictated by the applicable version of Building Regulations.
Early engagement ensured that the most cost-effective and viable solutions were used to meet necessary requirements whilst maintaining a relatively consistent approach towards the development’s overall sustainability strategy.
Project Lead: Mitchel Bennellick, Senior Sustainable Consultant
Situation | Result | Impact |
Bath Western Riverside is a multi-phased development consisting of 813 units both commercial and residential. The goals were to provide at least 10% carbon savings from renewables or low-zero carbon energy technologies, and to meet BREEAM requirements. | AES were appointed to ensure that the dwelling adhered to the Code for Sustainable Homes and BREEAM requirements. Each phase consisted of different construction methods, innovative architectural design and was dictated by the applicable version of Building Regulations. | Early engagement ensured that the most cost-effective and viable solutions were used to meet the necessary requirements per phase. We ensured a consistent approach to the development's overall sustainability strategy. |
Bath Western Riverside, is a multi-phased development consisting of 813 units including residential dwellings and commercial spaces. Crest Nicholson Regeneration has re-developed a once industrial intensive site into an attractive riverside community.
The entire development’s space heating and hot water demands are served by central plants consisting of Mains Gas CHP, Biomass boilers and Gas back-up boilers.
Bath Western Riverside had site wide targets to provide at least 10% carbon savings from renewables and/or low-zero carbon energy technologies, as well as meeting all the requirements set by the Code for Sustainable Homes and BREEAM.
For the Bath Western Riverside development, we achieved the site wide targets through early engagement with the design team to ensure that the most cost-effective and viable solutions were used to meet the necessary requirements per phase.
Each phase consisted of different construction methods, innovative architectural design and were dictated by the applicable version of Building Regulations.
Early engagement ensured that the most cost-effective and viable solutions were used to meet necessary requirements whilst maintaining a relatively consistent approach towards the development’s overall sustainability strategy.
Project Lead: Mitchel Bennellick, Senior Sustainable Consultant
AES Sustainability Limited
4b Oaklands Court
Tiverton Way
Tiverton Business Park
Tiverton
Devon EX16 6TG
01884 242050
info@aessc.co.ukDesigned by Optix Solutions. Developed by morphsites®
This website uses cookies to ensure you get the best experience. Learn more